Image Gallery
Time to rethink the common elbow
The idustry has tried:
- hardening the metal
- different types of metals
- different ceramics/coatings
Washed 4” Inlet
Unit was in service for 1 year with MJM Production Services and preformed approx 130 fracs , Brazer Jet pad work. Eliminated the need to shut down operations and NO Wash To Atmosphere. Inlet was replaced between jobs. Giving the operator the needed time to replace and no panic factor.
The same would apply to a Production Installations where there is no operator present. Fitting could be hooked to ESD or Sensor notifying operations that there is going to be an issue. Again avoiding need for Emergency Response and making it an Engineered Shutdown. Helping oil companies with Environment and Safety Issues and Lost Production.
Below is an example of how the Matrix EWS could have prevented an expensive and dangerous wash-out